by agency | Oct 29, 2025 | Blog
Vault Cleaning & Painting – Confined Space Maintenance for Active Pipeline In 2025, CTIS completed a vault cleaning and painting project for an active energy pipeline in Maine. This short-duration, two-day maintenance project required confined space entry and was...
by agency | Oct 29, 2025 | Blog
AST Decommissioning & Removal – Industrial Tank Demolition and Disposal In 2025, CTIS was contracted to perform the decommissioning and removal of an aboveground storage tank (AST) located in the basement of an industrial facility in Philadelphia, Pennsylvania....
by agency | Oct 29, 2025 | Blog
Power Pellets Distribution – Solidification Support for Liquid Spoils Management In 2025, CTIS coordinated the distribution of approximately 50 tons of Power Pellets across multiple project sites throughout the Northeastern United States. These high-performance...
by agency | Oct 29, 2025 | Blog
Peroxide Distribution – Chemical Supply & Injection Support In 2025, CTIS successfully managed the distribution of over 5,000 gallons of hydrogen peroxide to support multiple well injection events for one of our industrial clients in New Jersey. This project...
by agency | Oct 29, 2025 | Blog
Pipeline ROW Mowing & Maintenance – Vegetation Control for Energy Infrastructure In 2025, CTIS was contracted to provide right-of-way (ROW) mowing and maintenance services for a natural gas pipeline system in Ohio. This project ensured safe access, operational...
by agency | Oct 29, 2025 | Blog
Aluminum Phosphide Transportation & Disposal – Hazardous Waste Management In 2025, CTIS was contracted to perform the transportation and disposal (T&D) of 12 hazardous waste drums containing aluminum phosphide residues. These materials were generated after the...