Vault Cleaning/Painting

Vault Cleaning & Painting – Confined Space Maintenance for Active Pipeline

In 2025, CTIS completed a vault cleaning and painting project for an active energy pipeline in Maine. This short-duration, two-day maintenance project required confined space entry and was executed with a strong emphasis on safety, precision, and operational continuity.

The CTIS team successfully performed surface cleaning, coating preparation, and protective painting inside the vault while adhering to all OSHA confined space entry standards. Through careful coordination with the client and efficient work planning, the project was completed on time and without disrupting pipeline operations, achieving the goal of minimal downtime and maximum safety.

This project reflects CTIS’s expertise in pipeline maintenance, confined space operations, and industrial coating services, providing reliable, compliant, and high-quality field support for critical energy infrastructure.


Project Snapshot

Sector: Private / Energy / Industrial
Location: Maine
Project Year: 2025
Contract Value: $12,000