HDPE Pipeline Replacement – Petroleum Terminal Infrastructure Upgrade
CTIS executed a comprehensive HDPE pipeline replacement at an active petroleum terminal in East Chicago, Indiana, delivering a seamless transition to a modern, corrosion-resistant system under the highest safety standards. Our end-to-end scope included:
-
Waste management: Transportation and disposal of all demolition byproducts in full regulatory compliance.
-
Decommissioning: Demolition and safe abandonment of existing carbon steel groundwater piping.
-
New installations: Fabrication and installation of aboveground steel piping with engineered support structures.
-
Subsurface work: Precision trenching and below-grade placement of HDPE pipeline.
-
Quality assurance: Rigorous pressure and leak testing to certify system integrity before handover.
This project highlights CTIS’s expertise in multi-discipline infrastructure services for the Oil & Gas, Industrial, and Civil sectors.
Project Snapshot
-
Sector: Private / Industrial / Civil / Oil & Gas
-
Location: East Chicago, Indiana
-
Project Year: 2025
-
Contract Value: $320,000
